![]() |
![]() |
![]() |
#6
|
||||
|
||||
![]() Quote:
An artifical surface will be needed and that will cost at least $10M, and that is based on replacing the surfaces at SA/HP/DM over an existing track. At Los Al they have to build a new mile track, build a turf, and then a Qtr track. Dont know if anyone has ever been there, I have plenty of times, as I live in OC. It needs alot of work on the stands. Actually it needs to be torn down and rebuilt. It certainly isnt up to the standards of a Major League circuit track. Then they still need barn work. |